and isolated area of significant size (more than 800,000 inhabitants). The first
stage (M1-M6) will consist of a study of the... storage, nor the possibilities offered by demand response or grid-edge storage. The second
stage (M4-M24) will aim to study... - €1975 per month -
Voir cette offre d'emploi